Translator Search Order Form
Send To: Sterling
Communications, Inc.
219 Dodd
Ringgold, GA 30736
(706) 965-2355
(706) 965-3755 fax
sterling@catt.com
www.christianradiohome.com
AUTHORIZATION FORM FM TRANSLATOR CHANNEL SEARCH AT
(city)____________,( state) ______
FM translators are permitted on a non-interfering secondary basis.
Using the geographic coordinates of your community, our computer will determine the exact
distance to the nearest station or assignment on each frequency.
Prior to construction of any FM translator station, an FCC Construction Permit is required.
The next step following the frequency search is to file such an application, which is submitted on FCC
Form 349.
The Form includes an engineering section, which our office routinely completes along with all
associated technical exhibits, legal, financial, and programming sections, which are completed with the
assistance of an attorney specializing in practice before the FCC.
After "tendering" the application for filing with the Commission, a period of several months
will pass before it is reached for study. First, a preliminary review of the engineering will be
completed, and any obvious defects will be identified. If there are none, an announcement will be
made that the application has been "accepted for filing" and a "cut-off" date will be announced after
which other applications which compete or are in conflict with it cannot be accepted for filing.
After cut-off passes, final study of the application is completed. If there are no conflicts with
other applications on file before cut-off, and if the legal, financial, and programming data shows the
applicant to be qualified under the FCC Rules, grant of the Construction Permit can be expected
usually within a few months.
The total time from tender to grant is typically nine to twelve months.
All stations and assignments listed in the FCC files will be considered by the program in the
preparation of the study.
An engineering analysis of the results and our recommendation will accompany the study. The
study will require approximately four (4) weeks from receipt of your authorization. To authorize a
Frequency Allocation Study of the community listed above, sign this form, retain a copy, and return
the other to us with your check for $295.00.
Name & Address
Signed:__________________________________ Date:__________________
If you need the FREE
Adobe Acrobat Reader to view our downloads, click here.